Stay on one row while resolving this is a floor, bedding or screed condition — M9. M9 is a plaster row: 30 L/min, particle ≤4 mm and a 25 mm hose.
Stay on one row while resolving this is a floor, bedding or screed condition — M9. M9 is a plaster row: 30 L/min, particle ≤4 mm and a 25 mm hose. | Pinjin Machinery. Stay on one row while resolving this is a floor, bedding or screed condition — M9. M9 is a plaster row: 30 L/min, particle ≤4 mm and a 25 mm hose.. Keep this cell as published. This is a floor, bedding or screed condition. The neighbouring machine is not this sentence. M9 is a plaster row: 30 L/min, particle ≤4 mm and a 25 mm hose. Read it in the Xingtai table. It is not a cubic-metre concrete pump. Taken from the printed row: Hebei Pinjin Machinery in Xingtai lists M9 at 380 V / 50 Hz, 30 L/min, 50 bar, 50 m horizontal / 20 m vertical, hose 25 mm, hopper 115 L, loading height 90 cm, particle ≤4 mm, 1230 × 720 × 1550 mm and 200 kg. Keep this cell as published. Do not move the same condition onto Hydraulic Concrete Spraying Machine, which prints 380 V, all-copper dual motors 7.5/9 kW, 5 m³/h, 8 MPa, 100 m horizontal / 50 m vertical, hose 38/51 mm, particle ≤8 mm, sand-cement ratio ≤1:3, 1500 × 700 × 1100 mm and 295 kg. The neighbouring machine is not this sentence. The photograph is a working-condition reference from a public article about this kind of work. Read it in the Xingtai table. It is not a Pinjin contract record. Taken from the printed row: This page names no project, no country job, no price and no daily volume. Under “Inverse functions”, is the photograph a Pinjin jobsite? Keep this cell as published. No. It shows this kind of work. Hebei Pinjin Machinery does not name it as a contract record. What should stay printed beside “Addition Formula” — What does the M9 row print for this check? The neighbouring machine is not this sentence. M9 is a plaster row: 30 L/min, particle ≤4 mm and a 25 mm hose. It is not a cubic-metre concrete pump. “Sum and Difference Formula” does not change the check: Is the printed output a contract volume? Read it in the Xingtai table. No. M9 prints theoretical catalogue figures only. This page names no floor, no contract volume and no price. What should I send with an inquiry? Send mix or material, maximum aggregate, required output, horizontal and vertical distance, diesel or site voltage/frequency, country and purchase timing. Parts need name, size and quantity. WhatsApp or email to the Xingtai factory. Does Pinjin sell boom pumps, spraying machines or mixing plants? Spraying machines are listed on /products/spraying-machines (hydraulic/diesel concrete sprayers and M9 plaster). Mixing plants and truck-mounted placing booms are not listed. Trailer pumps remain on the pump hubs. Do you have an overseas warehouse or a published dealer list? No. Equipment ships from Xingtai. This site does not claim an overseas warehouse, exclusive distributors or a global after-sales network. Are the numbers on this page catalogue figures? Yes. Only figures already printed on product pages are used. Missing cells stay blank. We do not invent certifications, stock, lead times or on-site guaranteed output. Page /en/blog/thin-floor-coat-m9-only/.