The buyer’s check on this page is this is a floor, bedding or screed condition — Hydraulic Concrete Spraying Machine. Stay inside particle ≤8 mm, sand-cement ratio ≤1:3 and 5 m³/h.

The buyer’s check on this page is this is a floor, bedding or screed condition — Hydraulic Concrete Spraying Machine. Stay inside particle ≤8 mm, sand-cement ratio ≤1:3 and 5 m³/h. | Pinjin Machinery. The buyer’s check on this page is this is a floor, bedding or screed condition — Hydraulic Concrete Spraying Machine. Stay inside particle ≤8 mm, sand-cement ratio ≤1:3 and 5 m³/h.. The neighbouring machine is not this sentence. This is a floor, bedding or screed condition. Read it in the Xingtai table. Stay inside particle ≤8 mm, sand-cement ratio ≤1:3 and 5 m³/h. Taken from the printed row: That particle window is not a 24 mm structural stone line. Keep this cell as published. Hebei Pinjin Machinery in Xingtai lists Hydraulic Concrete Spraying Machine at 380 V, all-copper dual motors 7.5/9 kW, 5 m³/h, 8 MPa, 100 m horizontal / 50 m vertical, hose 38/51 mm, particle ≤8 mm, sand-cement ratio ≤1:3, 1500 × 700 × 1100 mm and 295 kg. The neighbouring machine is not this sentence. Do not move the same condition onto Electric 20, which prints 22 kW, 8–10 m³/h, 10 MPa, 120 m horizontal / 40 m vertical, pipe 80 mm, aggregate 1–2 cm, hopper 0.25 m³, 2800 × 1300 × 1500 mm and 900 kg. Read it in the Xingtai table. The photograph is a working-condition reference from a public article about this kind of work. Taken from the printed row: It is not a Pinjin contract record. Keep this cell as published. This page names no project, no country job, no price and no daily volume. What should stay printed beside “Methods” — Is the photograph a Pinjin jobsite? The neighbouring machine is not this sentence. No. It shows this kind of work. Hebei Pinjin Machinery does not name it as a contract record. “Materials” does not change the check: What does the Hydraulic Concrete Spraying Machine row print for this check? Read it in the Xingtai table. Stay inside particle ≤8 mm, sand-cement ratio ≤1:3 and 5 m³/h. That particle window is not a 24 mm structural stone line. Is the printed output a contract volume, once the outline says “Masonry construction”? No. Hydraulic Concrete Spraying Machine prints theoretical catalogue figures only. This note names no floor, no contract volume and no price. What should I send with an inquiry? Send mix or material, maximum aggregate, required output, horizontal and vertical distance, diesel or site voltage/frequency, country and purchase timing. Parts need name, size and quantity. WhatsApp or email to the Xingtai factory. Does Pinjin sell boom pumps, spraying machines or mixing plants? Spraying machines are listed on /products/spraying-machines (hydraulic/diesel concrete sprayers and M9 plaster). Mixing plants and truck-mounted placing booms are not listed. Trailer pumps remain on the pump hubs. Do you have an overseas warehouse or a published dealer list? No. Equipment ships from Xingtai. This site does not claim an overseas warehouse, exclusive distributors or a global after-sales network. Are the numbers on this page catalogue figures? Yes. Only figures already printed on product pages are used. Missing cells stay blank. We do not invent certifications, stock, lead times or on-site guaranteed output. Page /en/blog/mortar-screed-hydraulic-sprayer/.

Contact inquiry WhatsApp email