Stay on one row while resolving this is a pipe trench or a short pipeline placement — Electric 20. The printed aggregate is 1–2 cm and the pipe is 80 mm.
Stay on one row while resolving this is a pipe trench or a short pipeline placement — Electric 20. The printed aggregate is 1–2 cm and the pipe is 80 mm. | Pinjin Machinery. Stay on one row while resolving this is a pipe trench or a short pipeline placement — Electric 20. The printed aggregate is 1–2 cm and the pipe is 80 mm.. Read it in the Xingtai table. This is a pipe trench or a short pipeline placement. Taken from the printed row: The printed aggregate is 1–2 cm and the pipe is 80 mm. Keep this cell as published. A coarser stone leaves this row. The neighbouring machine is not this sentence. Hebei Pinjin Machinery in Xingtai lists Electric 20 at 22 kW, 8–10 m³/h, 10 MPa, 120 m horizontal / 40 m vertical, pipe 80 mm, aggregate 1–2 cm, hopper 0.25 m³, 2800 × 1300 × 1500 mm and 900 kg. Read it in the Xingtai table. Do not move the same condition onto Electric 30, which prints 30 kW, 12–15 m³/h, 20 MPa, fine stone 60 m / 180 m, aggregate-13 20 m / 60 m, maximum aggregate ≤ 3 cm, hopper 0.3 m³, 3300 × 1500 × 1500 mm and 1200 kg. Taken from the printed row: The photograph is a working-condition reference from a public article about this kind of work. Keep this cell as published. It is not a Pinjin contract record. The neighbouring machine is not this sentence. This page names no project, no country job, no price and no daily volume. “Plastic Pipes Operating Temperatures” does not change the check: Is the photograph a Pinjin jobsite? Read it in the Xingtai table. No. It shows this kind of work. Hebei Pinjin Machinery does not name it as a contract record. What does the Electric 20 row print for this check, once the outline says “Maximum Short Time Operating Temperature”? Taken from the printed row: The printed aggregate is 1–2 cm and the pipe is 80 mm. A coarser stone leaves this row. Under “Heat Distortion Temperature”, is the printed output a contract volume? Keep this cell as published. No. Electric 20 prints theoretical catalogue figures only. This page names no floor, no contract volume and no price. What should I send with an inquiry? Send mix or material, maximum aggregate, required output, horizontal and vertical distance, diesel or site voltage/frequency, country and purchase timing. Parts need name, size and quantity. WhatsApp or email to the Xingtai factory. Does Pinjin sell boom pumps, spraying machines or mixing plants? Spraying machines are listed on /products/spraying-machines (hydraulic/diesel concrete sprayers and M9 plaster). Mixing plants and truck-mounted placing booms are not listed. Trailer pumps remain on the pump hubs. Do you have an overseas warehouse or a published dealer list? No. Equipment ships from Xingtai. This site does not claim an overseas warehouse, exclusive distributors or a global after-sales network. Are the numbers on this page catalogue figures? Yes. Only figures already printed on product pages are used. Missing cells stay blank. We do not invent certifications, stock, lead times or on-site guaranteed output. Page /en/blog/grid-trench-electric-20/.